Featured Roofing Project 
This was an eco roof which entailed 18mm plywood to all areas then to fix 2 x 2 batons for breather space.  
 
Felt and baton roof with breathable felt. 
 
We then nailed grade 2 Cedar Shingles with silicone bronzed nails/ stainless steel nails. 
 
The top of the roof was finished off with copper faced torched- on felt. 
 
This project has taken approximately nine weeks. 
 
This was a very complex project that was completed in time and on budget.