This was an eco roof which entailed 18mm plywood to all areas then to fix 2 x 2 batons for breather space.
Felt and baton roof with breathable felt.
We then nailed grade 2 Cedar Shingles with silicone bronzed nails/ stainless steel nails.
The top of the roof was finished off with copper faced torched- on felt.
This project has taken approximately nine weeks.
This was a very complex project that was completed in time and on budget.